Home / LEED Matrix

LEED Matrix

Category

Prerequisite

Description

Sustainable Sites

SS Prerequisite 1

Reduce potential construction-related soil erosion, waterway sedimentation and dust.

Energy & Atmosphere*

EA Prerequisite 1

Fundamental commissioning of building energy systems

EA Prerequisite 2

Meet the minimum energy performance standards in ASHRAE 90.1-2004

EA Prerequisite 3

HVAC units cannot contain CFC-based refrigerants

Materials & Resources

MR Prerequisite

Establish an area on the job site for recycling of building materials.

Indoor Environmental Quality

EQ Prerequisite 1

A minimum level of Indoor Air Quality performance must be met to enhance IAQ in buildings, in order to contribute to the comfort and well-being of the occupants, with a ventilation system that meets the ASHRAE 61.1-2004 standard for Ventilation for Acceptable Indoor Air Quality.

EQ Prerequisite 2

Environmental Tobacco Smoke (ETS) Control by prohibiting smoking in the building, locate any exterior smoking areas at least 25 feet from entrances, air intakes and operable windows. Another option is to contain, capture and remove tobacco smoke from a room for smoking. In residential buildings, the transfer of tobacco smoke between units must also be addressed by sealing wall, ceiling and floor penetrations.


*Note: There are also two prescriptive compliance paths that LEED offers to project teams, including following the ASHRAE Advanced Energy Design Guide for Small Office Buildings 2004 for 4 LEED points. The second prescriptive path option offers 1 point toward LEED certification through compliance with the Basic Criteria and Prescriptive Measures of the Advanced Buildings Benchmark™ Version 1.1 with some exceptions and restrictions.

Mapes LEED Matrix

Category

Credit

Description

Award Points

LEED Requirements

 

Sustainable Sites

SS Credit 7

Heat Island Affect: Non-Roof

1

Intent
Reduce heat islands (thermal gradient differences between developed and undeveloped areas) minimize the impact on a regional climate, and human and wildlife dwellings.

Requirements 7: Any exterior surface used to shade the project boundaries must have an SRI (Solar Reflectance Index) of at least 29.

Mapes-R Solar Cool colors can reduce the potential for heat absorbtion and reflection of the wall system.

SS Credit 8

Light Pollution Reduction

1

Intent
Minimize the impact of a building's interior and exterior lighting, glare and sky-glow on nocturnal habitats within four levels of development densities (rural, residential, high-density, city).

Requirements 8: For interior lighting: angle interior lighting sources away from exteriors to avoid candela leaving through the windows or place lights on automatic timer for non-business hours.

Mapes-R panels can be designed to minimize the exit of interior lighting and/or provide internal reflectance of ambient light.

Energy & Atmosphere

EA Credit 1

Optimize Energy Performance

1 - 10

Intent
Achieve increasing levels of energy performance above the baseline in the prerequisite standard to reduce environmental and economic impacts associated with excessive energy use.

Optimized Energy Performance: Whole Building Energy Simulation
Demonstrate a percentage improvement in the proposed building performance rating compared to the baseline building performance rating per ASHRAE/IESNA Standard 90.1-2004 (without amendments) by a whole building project simulation using the Building Performance Rating Method in Appendix G of the Standard. The minimum energy cost savings percentage for each point threshold is as follows:

Mapes-R panels provide a significant increase in the overall energy efficiency of glazing and wall systems up to R-27.79

New Buildings

Existing Building Renovations

Award Points

10.5%

3.5%

1

14%

7%

2

17.5%

10.5%

3

21%

14%

4

24.5%

17.5%

5

28%

21%

6

31.5%

24.5%

7

35%

28%

8

38.5%

31.5%

9

42%

35%

10

Materials & Resources

MR Credit 3.1

Materials Reuse: Specify 5%

1

Intent
Reuse building materials and products in order to reduce demand for virgin materials and to reduce waste, thereby reducing impacts associated with the extraction and processing of virgin resources.

Requirements 3.1: Specify salvaged, refurbished or reused materials such that the sum of these materials constitutes at least 5%, based on cost, of the total value of materials on the project.

Requirements 3.2: Specify salvaged, refurbished or reused materials for an additional 5% beyond MR Credit 3.1 (10% total based on cost).

Potential Technologies & Strategies
Identify opportunities to incorporate salvaged materials into building design and research potential material suppliers. Consider salvaged materials such as beams and posts, flooring, paneling, doors and frames, cabinetry and furniture, brick and decorative items.

Mapes-R panels utilize a high percentage of recycled material including aluminum and non virgin polystyrene.

MR Credit 3.2

Materials Reuse: Specify 10%

1

MR Credit 4.1

Recycled Content 10% (post-consumer + 1/2 pre-consumer)

1

Intent
Increase demand for building products that incorporate recycled content materials, thereby reducing impacts resulting from extraction and processing of virgin materials.

Requirements 4.1: Use materials with recycled content such that the sum of post-consumer recycled content plus one-half of the pre-consumer content constitutes at least 10% (based on cost) of the total value of the materials in the project.

Requirements 4.2: Use materials with recycled content such that the sum of post-consumer recycled content plus one-half of the pre-consumer content constitutes and additional 10% beyond MR Credit 4.1 (total of 20%, based on cost) of the total value of the materials in the project.

Mapes-R panels utilize recycled aluminum constituting up to 40% of our end product base metal.

MR Credit 4.2

Recycled Content 20% (post-consumer + 1/2 pre-consumer)

1

MR Credit 5.1

Local/Regional Materials 10% Extracted, Processed & Manufactured Regionally (for LEED v. 2.2)

1

Intent
Increase demand for building materials and products that are extracted and manufactured within the region, thereby supporting the use of indigenous resources and reducing the environmental impacts resulting from transportation.

Requirements 5.1: Specify building materials or products that have been extracted, harvested or recovered, as well as manufactured, within 500 miles of the project site for a minimum of 10% (based on cost0 of the total materials value. If only a fraction of a product or material is extracted/harvested/recovered and manufactured locally, then only that percentage (by weight) shall contribute to the regional value.

Requirements 5.2: Specify a total of 20% based on cost of the total material value.

Mapes insulating core of 2# density polystyrene is manufactured locally.

MR Credit 5.2

Local/Regional Materials 20% Extracted, Processed & Manufactured Regionally (for LEED v. 2.2)

1

MR Credit 6

Rapidly Renewable Materials

1

Intent
Reduce the use and depletion of finite raw materials and long-cycle renewable materials by replacing them with rapidly renewable materials.

Requirements 6: Use rapidly renewable building materials and products (made from plants that are typically harvested within a ten-year cycle or shorter) for 2.5% of the total value of all building materials and products used in the project, based on cost.

Mapes tempered hardboard substrates originate from renewable forest sources.

MR Credit 7

Certified Wood

1

Intent
Encourage environmentally responsible forest management.

Requirements 7: Use a minimum of 50% of wood-based materials and products, which are certified in accordance with the Forest Stewardship Council's (FSC) Principles and Criteria, for wood building components. These components include, but are not limited to, structural framing and general dimensional framing, flooring, sub-flooring, wood doors and finishes.

All Mapes-R components do not outgas any VOC.

Indoor Env. Quality

 

Daylight & Views

 

Intent
Provide for the building occupants a connection between indoor spaces and the outdoors through the introduction of daylight views into the regularly occupied areas of the building

Requirements 8.1: Achieve a minimum daylight factor of 2% (excluding all direct sunlight penetration) in 75% of all spaces occupied for critical visual tasks. Spaces excluded from this requirement include copy rooms, storage areas, mechanical plant rooms, and laundry rooms and other low occupancy support areas. Other expectations for space where tasks would be hindered by the use of daylight will be considered on their merits. There are three options for compliance with the Credit Category (1) calculation of the glazing factor, (2) computer simulation showing 25 footcandles has been achieved in at least 75% of all occupied areas, (3) or measurement of the indoor light levels meeting the minimum requirements of 25 footcandles within the occupied space.

Requirements 8.2: Achieve direct line of sight to vision glazing for building occupants in 90% of all regularly occupied spaces. Examples of exceptions include copy rooms, storage areas, mechanical, laundry and other low occupancy support areas. Other exceptions will be considered on their merits.

Low-VOC sealants are applied during manufacturing for less offgassing during construction and over the life span of the enclosed structure.

EQ Credit 8.1

Daylight 75% of Spaces

1

EQ Credit 8.2

Views 90% of Spaces

1

Innovation
& Design Process

ID Credit 1.1

Innovation in Design: Daylighting

1

Intent
To reward project teams for exceptional performance above the requirements set by the LEED-NC Green Building Rating System and innovative performance in categories not addressed by LEED.

Requirements 1: A written proposal identifying the intent and requirements for compliance, submittals, and the design strategies to be applied for energy performance, water efficiency, and environmental and health benefits.

 

ID Credit 1.2

Innovation in Design: Water Conservation

1

Mapes-R manufacturing processes utilize a closed loop water reclamation system.

ID Credit 1.3

Innovation in Design: IAQ

1

Mapes-R panels are designed to improve energy efficiency in specialty applications which can limit impact exposure and extend the product lifecycle for glazing components and wall construction.


Disclaimer:

Points toward the LEED Green Building Rating System are not awarded on the basis of products but on the building performance achieved through sustainable design, construction and operations of buildings, which can include the use of sustainable materials, products and assemblies offered by Mapes Industries, Inc.

The above LEED credit section references are for suggested applications of Mapes products. The LEED applicant is ultimately responsible for determining the product attributes that will help enhance energy efficiency and reduce the environmental impact and, therefore, provide LEED-certification of a structure. The Mapes products covered in this guideline can assist building teams in obtaining LEED points as long as the overall design meets or exceeds the LEED performance standards.

The final decision on LEED compliance ultimately relies on the judging panel at USGBC. The role of the architect, designer, contractor or other member of the team is to document a building’s sustainable design, construction, operation and performance data, and to make that data available to the USGBC. Mapes recommends project teams employ a LEED Accredited Professional to compile the necessary documentation for review and submittal to the USGBC for a positive outcome.

Mapes glazing and extruded aluminum products can perform at higher levels beyond the scope of the standards in the LEED rating system. In such cases, project teams have several options when specifying Mapes high performance architectural systems, including a request for a Credit Interpretation Ruling (CIR) from the USGBC Technical and Scientific Advisory Committee. Another strategy is to document the exemplary performance of Mapes assemblies from a whole building design perspective in the LEED Innovation in Design credit category.


Mapes Panels
2929 Cornhusker Hwy
Lincoln, NE 68504
Phone: 800-228-2391
Fax: 800-737-6756
http://www.mapespanels.com